《运营管理》课后习题答案

更新时间:2023-07-20 11:33:09 阅读: 评论:0

Chapter 02 — Competitiveness, Strategy, and Productivity
3.
(1)
(2)
(3)
(4)
(5)
(6)
(7)
 
Week
Output
Worker Cost@
$12x40
Overhead Cost @1。5
Material Cost@$6
Total    Cost
MFP      (2) ÷ (6)
1
30,000
2,880
4,320
pke2,700
9,900
3。03
2
33,600
3,360
5,040
2,820
11,220
2。99
3
32,200
3,360
5,040
2,760
11,160
2。89
4
35,400
3,840
5,760
2,880
12,480
2.84
*refer to solved problem #2
Multifactor productivity dropped steadily from a high of 3。03 to about 2.84.
4。        a。    Before: 80 ÷ 5 = 16 carts per worker per hour.
        After: 84 ÷ 4 = 21 carts per worker per hour。
b。    Before: ($10 x 5 = $50 + $40 = $90; hence 80 ÷ $90 = 。89 carts/$1。
    After: $10 x 4 = $40 + $50 = $90; hence 84 ÷ $90 = .93 carts/$1。
c.    Labor productivity incread by 31.25%    (21-16)/16).
    Multifactor productivity incread by 4。5% ((。93—89)/.89).
*Machine Productivity
Before:  80 ÷ 40 = 2  carts/$1.
poz
After:   84 ÷ 50 = 1.68 carts/$1。
Productivity incread by —16%    (1.68—2)/2)
Chapter 03 — Product and Service Design
6。    Steps for Making Cash Withdrawal from an ATM
    1.    Inrt Card: Magnetic Strip Should be Facing Down
    2.    Watch Screen for Instructions
    3。    Select Transaction Options:
        1)    Deposit
        2)    Withdrawal
        3)    Transfer
        4)    Other
    4。    Enter Information:double date什么意思
        1)    PIN Number
        2)    Select a Transaction and Account
        3)    Enter Amount of Transaction
    5.    Deposit/Withdrawal:
        1)    Deposit-place in an envelope (which you’ll find near or in the ATM) and inrt it into the deposit slot
        2)    Withdrawal—lift the “Withdrawal Door," being careful to remove all cash
    6。    Remove card and receipt (which rves as the transaction record)
   
8.
Technical
Requirements
Ingredients
Handling
Preparation
Customer Requirements
Taste
stayed
Appearance
Texture/consistency
Chapter 04 - Strategic Capacity Planning for Products and Services
2。   
    Actual output = 。8 (Effective capacity)
    Effective capacity = 。5 (Design capacity)
    Actual output = (。5)(.8)(Effective capacity)
    Actual output = (。4)(Design capacity)
    Actual output = 8 jobs
    Utilization = .4
   
   
10。    a。    Given:    10 hrs。 or 600 min。 of operating time per day.
                250 days x 600 min。 = 150,000 min. per year operating time。
bec中级词汇火星字翻译
   
Total processing time by machine
Product
A
B
C
1
48,000
64,000
32,000青少年游学
2
48,000
48,000
36,000
3
30,000
36,000
24,000
taonan4
60,000
60,000
30,000
amongstTotal
186,000
208,000
122,000
   
You would have to buy two “A” machines at a total cost of $80,000, or two “B” machines at a total cost of $60,000, or one “C" machine at $80,000。
    b。    Total cost for each type of machine:
        A (2): 186,000 min ÷ 60 = 3,100 hrs。 x $10 = $31,000 + $80,000 = $111,000
收货单
    B (2) : 208,000 ÷ 60 = 3,466。67 hrs。 x $11 = $38,133 + $60,000 = $98,133
    C(1): 122,000 ÷ 60 = 2,033.33 hrs. x $12 = $24,400 + $80,000 = $104,400

本文发布于:2023-07-20 11:33:09,感谢您对本站的认可!

本文链接:https://www.wtabcd.cn/fanwen/fan/78/1106790.html

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。

标签:翻译   火星
相关文章
留言与评论(共有 0 条评论)
   
验证码:
推荐文章
排行榜
Copyright ©2019-2022 Comsenz Inc.Powered by © 专利检索| 网站地图