起钻打重浆计算公式SLUGCALC

更新时间:2023-07-17 17:43:32 阅读: 评论:0

i made faceSLUG  CALCULATIONS:四级真题
zeronetPIPE  O.D.  =5inches PIPE  I.D.  =  4.275inches
T.V. DEPTH=13,000feet
MUD WEIGHT =11.0lb/gal
shanks
DESIRED SLUG VOL.=15barrels
MUD DROP BELOW R.T. =350feet(300 - 400 ft)
NOTE: SMALL, HEAVY (3 - 5 PPG over Mud Wt.) SLUGS WORK BEST
SLUG WEIGHT REQUIRED =15.6lb/gal
BBL MUD FLOW BACK=  6.21barrels
(PAGE DOWN FOR INSTRUCTIONS)
德语好学吗This program calculates the following:
cool gay
关于圣诞节的资料
1. Weight of Slug to be mixed.
2.Vol. of mud displaced out of the annulus (flow back) by the 'U' tubing of the slug.
purpofully
NOTE:  1.The numbers show in RED are variables and may be altered to e
how they effect the calculations.
2. Pump SLUG, then open Standpipe bleed off valve, rotate pipe
without reciprocating until indicated flow back volume (APPROX.)bin是什么
is obrved in Trip Tank BEFORE PULLING PIPE.
3. The numbers calculated here are theoretical and do not take into account
friction caud by high viscosity, or restrictions in the string which may
inhibit the slugs ability to dry the pipe.  In the cas a heavier, or larger
slug, should be pumped using the calculations as a guideline.
>creature

本文发布于:2023-07-17 17:43:32,感谢您对本站的认可!

本文链接:https://www.wtabcd.cn/fanwen/fan/78/1101691.html

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。

标签:
相关文章
留言与评论(共有 0 条评论)
   
验证码:
推荐文章
排行榜
Copyright ©2019-2022 Comsenz Inc.Powered by © 专利检索| 网站地图