Cement Production Process
1. Quarry: Typically limestone, marl and clays as well as other materials containing the required
proportions of calcium, silicon, aluminium and iron oxides are extracted using drilling and blasting techniques.
2. Crusher: The quarried material is then reduced in size by compression and/or impact in various
mechanical crushers. Crushed rock is reduced in size from 120 cm to between 1.2 and 8 cm.
Drying of raw material may also be necessary for efficient crushing and pre-blending.
丁点
3. Conveyor: Raw material is then transported from the quarry using conveyors, rail wagons or other
suitable logistics solutions specific to the cement plant.
4. Mixing bed: The crushed limestone and clay is homogenized by stacking and reclaiming in a long
layered stockpile. This material is then ready for milling and drying in the kiln.
离合器打滑
5. Raw mill: The raw materials are milled and dried in a roller mill. Heavy rollers are held over a
rotating table and the cour material is milled until it is fine enough to be carried by air to a homogenizing silo.
6. Filter: Bag filters compri filters of either woven fabric or needle felts to remove particles from
kiln exhaust. The exhaust gas from many kilns is ud for drying raw materials, thus improving the energy efficiency of the plant.
7. Preheater: Cyclone preheaters enable the raw material of cement production to be preheated
before entry into the kiln. This increas the energy efficiency of the kiln as the material is 20-40% calcined at the point of entry into the kiln.half life
8. Kiln: The kiln is designed to maximize the efficiency of heat transfer from fuel burning to the rawoece
material. In the preheater tower the raw materials are heated rapidly to a temperature of about 1000°C, where the limestone forms burnt lime. In the rotating kiln, the temperature reaches up to 2000°C. At this high temperature, minerals fu together to form predominantly calcium silicate crystals - cement clinker.
obstacle9. Cooler: The molten cement clinker is then cooled as rapidly as possible. The ambient air ud to
cool the clinker is then fed into the kiln as combustion air - ensuring high utilization of the heat produced.
姐姐妹妹的梦想
10. Clinker silo: Clinker may be either stored on site in preparation for grinding to form cement, or
英国路冠
transported to other sites.雅思口语考试时间
11. Cement mill: Finish milling is the grinding together of cement clinker, with around 5% of natural or
synthetic gypsum. Other cementitious materials such as slag, flyash or other pozzolans may also be incorporated into the final cement powder.
中国研究生报名官网12. Logistics: Final cement may be transported pre-bagged or as a bulk powder. The method of
transport lected varies according to location - and may include transport via truck, rail or ship.
新年祝福 英语
Reference: