No system, or informal system partially implemented. | 0 points |
Informal system fully implemented, or partially documented system partially implemented. | 1 point |
Fully documented system partially implemented. | 2 points |
Documented system, fully implemented. | 3 points |
Documented system, fully implemented (includes documented measurable results and corrective actions). thames | 4 points |
Not Applicable (NA) | Not Scored |
Approved | 75% Required Minimum |
Conditionally Approved | 60% Required Minimum |
Approval Withheld | Less than 60% |
Section | Description | Questions | Points 九月的英文Available | Points Scored | 青岛翻译 | Percentage | ||
4.1 | Management Responsibility | 11 | 44 | |||||
4.2 | Quality System | 10 | 40 | |||||
4.3 | Contract Review | 3 | rock with you12 | |||||
4.4 | Design Control | 11 | 44 | |||||
4.5 | Document Control | 11 | 44 | |||||
4.6 | Purchasingcet6报名 | 6 | 24南京新东方官网 | |||||
学化妆的培训班4.7 | Customer - Supplied Product | 4 | 16 | |||||
4.8 | Product Identification and Traceability | 3 | 12 | |||||
4.9 | Process Control | 12 | 48 | |||||
4.10 | Inspection and Testing | 15 | 60 | |||||
4.11 | Inspection, Measuring and Test Equipment | 13 | 52 | |||||
4.12 | Inspection and Test Status | 1 | 4 | |||||
4.13 | Control of Non-Conforming Product | 7 | 28 | |||||
4.14 | Corrective and Preventative Action | 6 | 24 | |||||
4.15 | Handling, Storage, Packaging, Prervation and Deliverythe esntial 55 | 8 | 32 | |||||
gunlock4.16 | Quality Records | 7 | 28 | |||||
4.17 | Internal Quality Audits | 8 | 32 | |||||
4.18 | Training | 3 | 12 | |||||
4.19 | Servicing | 2 | 8 | |||||
公司年会发言稿 |
本文发布于:2023-07-06 06:21:19,感谢您对本站的认可!
本文链接:https://www.wtabcd.cn/fanwen/fan/78/1081244.html
版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。
留言与评论(共有 0 条评论) |