1.      ADANG BAY
Position   : Panamax Vesl 01-42-00 South / 116-30 East – Draft more than 13 m
01-43-50 South / 116-26-10 East – Draft abt 12 m
01-42-50 South / 116-26-30 East – Draft abt 16 m
04-42-00 South / 116-26-30 East – Draft abt 22 m
Port Restriction: No restriction (open a)
Pilot: Not compulsory
Loading Facility/Method  : 1. By ship's Gear and Grabs
- Capacity 7 Cbm / 5 Pcs of shipper's Grabs
- Capacity 12 Cbm / 4 Pcs of shipper's Grabs
 2. Loading by floating Crane for Gearless vesl's
sad的反义词
Loading Rate    : - Abt 10,000-12,000 MT/day (Ship's Gear)thief
- Abt 10,000-15,000 MT/day (Floating Crane)
Working Time : 24 hours/day, 7 days/week SHINC, Excluding National Major Holiday           
2.APAR BAY (PETANGIS)
Position  : Lat 02-00-00 South / Long 116-43-00 )Draft abt 16 m
Port Restriction : No Restriction (open a)               
Pilot  : No Compulsory
Loading Facility/Method : By ship's Cranes and Floating Cranes 2 (Two) unit
- 6 (six) Units Tug Boat
- 5 (five) Barges With Capacity 7,000 MT/Unit
- Fresh Water and Bunker is not available
Loading Rate  : By Floating Crane abt. 20,000 MT/Day
By ship's Crane abt. 5,000 – 7,000 MT
Working Rate   : 14 hours/Day, 7days/week SHINC, excluding Nationality Major Holiday
3.BALIKPAPAN COAL TERMINAL
Position  : Lat 01-21-00 South / Long 116-47-00 East
Pilot Boarding Position : Lat 01-21-20 South / Long 116-56-54 East
Meanwhile following are the update formula for calculating the sailing draft at Balikpapan Coal Terminal as follow:
13 M LWS + HIGH TIDE WATER
Loading Facilities    : One Luffing Traveling Conveyor
lo过去式
雅思6分培训班Average loading rate   : 1,750 MT/Hour
Port Restriction   : - Maximum LOA            : 250 Mtrs
- Maximum Beam  : 43 Mtrs
- Maximum DWT   : 90,000 MT
- Maximum Air Draft  : 17 m
- Maximum Sailing Draft : 13 Mtrs + high tide (depen on high tide water)
 Working Time   : 24 hours/day, 7 days/week SHINC, Excluding National Major Holiday       
 4.      BONTANG COAL TERMINAL
Terminal Position   : Lat 00-00-01 South / Long 117-32-16 East
Anchor Position: 1. Lat 00-00-00 South / Long 117-35-02 East
2. Lat 00-00-02 South / Long 117-35-00 East
Pilot Boarding Ground: Lat 00-00-00 South / Long 117-35-00 East
Loading Facility   : By Loader Quadrant Type (One Unit)
 Loading Rate: About 1,700 – 2,000 MT/Hour
Working Time: 24 Hours/Day, 7 days/week SHINC, Excluding National Major Holidays
ivory Berth Owner: PT. INDOMINCO MANDIRI           
5. INDONESIAN BULK TERMINAL (SOUTH PULAU LAUT COAL TERMINAL)
Berth Position: Lat 04-02-00 South / Long 116-00-37 East
Anchor Position   : Lat 04-02-00 South / Long 116-00-00 East / max depth 20m
Port Restriction  : Max LOA    : 230 m
Max Beam  : 35 m
Max DWT  : 80,000 tons
Loading Method   : One Unit Starveling Conveyor
Working Time    : 24 Hours/Day, 7days/week SHINC, Excluding Nationality Major Holiday
6. JORONG ANCHORAGE
 Position : Lat 04-07-06 South / Long 115-04-05 East (Handy)
Lat 04-12-05 South / Long 115-05-09 East (Panamax)
Safe Draft Max   : 16 m
Port Restriction  : No Restriction (Open Sea)
Loading Method    : By Ship's gear and using grabs from barges to ship's hold with loadi
ng
rate average 8,000 – 10,000 MT/Day
Working Hours   : 24 Hours/Day, 7days/week SHINC, Excluding Nationality Major Holiday
7. MUARA PANTAI (BERAU ANCHORAGE)
Position  : Lat 01-56-40 North / Long 118-07-20 East (21 m depth)
 Lat 01-57-40 North / Long 118-05-30 East (17 m depth)
Port Restriction : No Restriction (Open Sea)
Pilot  : No Compulsory
Loading Facility/Methods  :日语工作 1. Loading by ship's Crane
2. Loading by SST (Semi Submersible Trans Shipper)
 Loading Rate  : - By Ship's Crane about 8,000 MT-10,000 MT/4 Gangs/Day
- By SST in average 12,000 MT-15,000 MT/Day核销是什么意思
Working Hours  : 24 Hours/Day, 7days/week SHINC, Excluding Nationality Major Holiday
8.NORTH PULAU LAUT COAL TERMINAL
Position  : Lat 03-12-00 South / Long 116-18-10 East
Anchor Position : Lat 03-12-00 South / Long 118-19-00 East
免费在线Pilot Boarding at Anchorage  : Lat 03-12-04 South / Long 116-19-06 East
Port Restriction  : - Max Draft at Berth      : 18 m
 - Max Draft at Channel  : 14 m + High tide
- Max Beam  : 46 m
好看的英文- Max LOA   : 320 m
Loading Facility/Method  : By Loader Conveyor
Loading Rate   : 1,500 2,000 MT/Hours
Working Hours  : 24 Hours/Day, 7days/week SHINC, Excluding Nationality Major Holiday 

本文发布于:2023-07-05 07:43:20,感谢您对本站的认可!

本文链接:https://www.wtabcd.cn/fanwen/fan/78/1079438.html

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。

标签:装港   煤炭   港口   核销   意思
相关文章
留言与评论(共有 0 条评论)
   
验证码:
推荐文章
排行榜
Copyright ©2019-2022 Comsenz Inc.Powered by © 专利检索| 网站地图