口行两优Chine Government Concessional Loan

更新时间:2023-07-01 17:10:20 阅读: 评论:0

Two Concessional Loan:
Two Concessional Loan means two kinds of concessional loans, such as Chine Government Concessional Loan 男的英文名字and insidejobPreferential Export Buyer‘s Credit Loan. Chine Government Concessional Loan (hereinafter referred to as the “concessional loans”) refers to the medium and long-term, low interest rate credit extended by China Eximbank under the designation of the Chine Government with the nature of official assistance. Preferential Export Buyer‘s Credit Loan(hereinafter referred to as the preferential buyer ) refers to the medium and long-term credit with preferential terms and conditions, aiming to promote Chinas economic and trade cooperation with other key countries and regions. 更唱叠和Approved by the state council, it is a particular loan.
1.The common characteristic:
Objective: To promote the economic and social development of the borrowing countries and improve living standards of people; to boost the Chinas economic cooperation with the borrowing countries.
Loan purpo: Fund manufacturing projects, infrastructure construction project and social welfare projects in the borrowing countries, which can generate promising economic returns or good social benefits; Finance the procurement of Chine mechanical, electronic products, complete ts of equipments, technology and rvices and other goods by the borrowing countries.
Prospective borrower: The borrower of concessional loan is normally the government of the borrowing country reprented by Ministry of Finance. Under special circumstances, the borrower could be a financial institution or other agencies designated by the government of the borrowing country and acceptable to China Eximbank. In such ca, Ministry of Finance of the borrowing country is required to provide repayment guarantee acceptable to the bank. Emphasize the government background.
Supported area: There is long-term promoting for economic and social development of the borrowing country; There has a good economic benefit and financial income; There could strengthen the Economic hematopoietic area of borrowing country, such as infrastr
ucture and manufacturing --- energy resources development, transportation, communication and so on.
2. The two main contents’ comparison
Concessional Loans
Preferential Buyer
Government authorities
The Ministry of Commerce(foreign aid); administrative cretary of the Ministry of Finance
The Ministry of Commerce (Department of Cooperation); The Ministry of Finance (Financial Department)
Sum
吸血鬼日记演员表
no less than RMB20 million
no less than USD2 million
Currency
RMB
USD
Financing percentage
maximum 100%
need a certain proportion of preparations by themlves generally is 15%
Borrower
Government of the borrowing country( reprented by the ministry of finance
Government of the borrowing country( reprented by the ministry of finance
Insurance
Not forcenow mainly u the project’s financial incomefor repayment or act as a supplement for financial repayment)
Not forcenow mainly u the project’s financial incomefor repayment or act as a supplement for financial repayment)
Interest rate
Perform the determining interest rates in inter-governmental concessional loans framework agreement. Fixed rate.
Perform the loan interest rates approved by Chine Government. Generally is fixed rate.
Term
Loan term is made of grace period  no more than 1/3 loan termincluding using loan periodand repayment period, loan term is 20 years. During grace periodborrower pays interest only and does not repay the principal After entering the repayment period, borrower repays interests and principal as stipulated in the loan agreement.
Loan term is made of grace period  no more than 1/3 loan termincluding using loan periodand repayment period, loan term is 20 years. During grace periodborrower pays interest only and does not repay the principal After entering the repayment period, borrower repays interests and principal as stipulated in the loan agreement.
Interest payment
好奇小猴乔治
Interest is calculated and paid mi-annually , interest payment dates are fixed on March, 21st and Sep. 21st every year (the last  interest payment date is the due date of loan)
Interest is calculated and paid mi-annually , interest payment  dates are fixed on Jan. 21st and July 21st every year (the last  interest payment date is the due date of loan)
Repayment of principal
An equal repayment once   mi-annually in  repayment periodthe number of repayment is the  year of repayment term X2,Repayment dates are  fixed on March, 21st and Sep. 21st every year (the last  repayment date is the due date of loan )
An equal repayment once mi-annually in repayment periodthe number of repayment is the  year of repayment term X2,Repayment dates are  fixed on Jan. 21st and July 21st every year (the last  repayment date is the due date of loan )
3.Loan &Financing Requirements
1)The project shall be approved by both the Chine Government and the Government of the borrowing country;
2)The borrowing country shall have sound diplomatic relations with Chine Government, and shall be politically stable and economically sound, with debt rvicing capacity and reliable contract-performance record;
3)The project shall be technically feasible;
4)The project is able to yield sound economic returns and social benefits;
多才多艺英语5)治疗青春痘方法Chine Companies shall be lected as the project contractor. And for procurement projects, equipment supply shall come form a Chine exporter in principle;
6)In project procurement or introduction, priority shall be given to equipment, materials, technology or rvices from China.  In principle, no less than 15% of engineering contract
ing projects and no less than 50% of total procurement (including the equipment procurement projects and equipment part of engineering contracting projects) shall be made in China.
7)The counterpart funds for the project shall be already in place;
8)Other documents required by the Chine Government and Eximbank.
4.The Esntial Data for Loan A高瞻远瞩英文ppraisal
1)Proposal (loan application letter) from Government of borrowing country, including project name, introduction, loan application amount, loan period, grace period, interest rate, Chine executive enterpris and the project owner, etc.my ideal job
2)Recommendation issued by the commercial counlorrealitys office of the Chine Embassy in the borrowing country;
3)Commercial contract or other types of cooperation agreements signed between the Chi
ne contractor/exporter and the local executing agency of the borrowing country, including reasonable and clear payment terms, Letter of guarantee to open arrangement, quantities, construction period, guarantee period, commence date, time for completion and effective date of the contract, etc.

本文发布于:2023-07-01 17:10:20,感谢您对本站的认可!

本文链接:https://www.wtabcd.cn/fanwen/fan/78/1072513.html

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。

标签:演员表   治疗   日记   方法   吸血鬼
相关文章
留言与评论(共有 0 条评论)
   
验证码:
推荐文章
排行榜
Copyright ©2019-2022 Comsenz Inc.Powered by © 专利检索| 网站地图