Total Score | Rating |
98 – 109 | Excellent – World Class Supplier | 汉译英在线翻译免费
87 – 97 | Good (+) – Exceeds Expectations |
76 – 86 | asda Good (-) – Meets Expectations |
65 – 75 | Marginal – Some Expectations Met |
54 – 64 | Poor – Does Not Meet Expectations |
3 | |
Quality Infrastructure质量基础设施 | |
∙ Well defined and functionally sound quality organization意义明确有效良好的质量组织 | 3 |
∙ Sketchy quality organization, poor lines of responsibility概略的质量组织,差劲的品质责任 | 2 |
give me everything∙ Nor formal quality organization, some quality responsibility没有正规的质量组织,一点点品质责任 | 1 |
Support Question: Organizational Chart published 已发布的组织结构图 | |
QUALITY SUPPORT | 5 |
∙ Strong design engineering and manufacturing engineering support精确的工程设计生产工程支持 | 5 |
∙ Little design, but strong M.E. support没有什么设计,主要靠宏观工程 | 3 |
∙ Little design and little M.E. support | 2 |
∙ No design and little M.E. support | 1 |
MEASUREMENT测量 | 3 |
∙ All levels of organization have some quality measurement所有组织层次都有质量测量 | 5 |
∙ Only production operations measured on quality只有生产操作有质量检测 | 3 |
∙ Only quality team members are measured on quality只有质量团队成员接受质量检测 | 2 |
∙ Only specific line elements have quality measurements只有特殊线接收质量检测 | 1 |
十六大报告全文 QUALITY SYSTEM | 3 |
∙ Comprehensive and updated quality plan with goals t for company为公司设立全面的最新的质量计划目标 | disappointed 5 |
∙ Basic quality philosophy plan documented基本的文件性质量理念规划 | 3 |
∙ Sketchy documents maintained in notebook style概略的以笔记本形式记录的文件 | 2 |
∙ Quality statement with little or no detail很少的质量申明 | 1 |
SUPPORT QUESTIONS: | |
Quality Systems Manual published?颁布的质量手册 | |
How do you assure prints, etc. are current and up-to-date?怎样保证其版本 | |
How often do you audit your Quality Systems Program?你们经常评估你们的质量体系吗 | |
How do you handle returned material?你们怎样处理返回的材料 | |
What is the Corrective Action process?校正过程是怎样 | |
How do you u your customer Quality Performance Report Feedback?怎样使用客户意见反馈表? | |
QUALITY INSTRUCTIONS质量说明 | |
∙ Detailed quality and SPC instructions on Critical to Quality Operations精细的质量和检测说明 关于严格的质量操作 | 5 |
∙ Detailed Quality instructions on CTQ operations | 4 |
∙ Brief t-up or operator check instructions | 3 |
∙ Centralized Quality instructions (not at operation/process) | 2 |
∙ Instructions developed but not ud (outdated, incorrect, etc.) | 1 |
SUPPORT QUESTION: Who has responsibility to issue Quality Plans谁负责颁布质量计划 | |
PROCESS FLOW CHARTS加工流程图 | |
∙ Detailed and accurate process flow charts on all process | 5 |
∙ Detailed and accurate process flow charts on lect process | 4 |
∙ fang>十一月英文General process flow diagrams (minimal detail) | 3钓凯子 |
∙ Process flow information available, but not charted | 2 |
∙ Sketchy process flow documentation available | 1 |
五年级数学应用题 | |
QUALITY INFORMATION EQUIPMENT & GAUGING质量信息装备和测量 | |
∙ Detailed calibration and Gauge R&R plans are maintained校准 | 5 |
∙ Equipment calibrated and Gauge R&R performed as needed | 4 |
∙ Only critical equipment calibrated on timely basis | 2 |
∙ Equipment/gauges checked only when customer complaints are received | 1 |
SUPPORT QUESTION: What is the calibration period for your testing equipment and other gauges? | |
测量设备和其他测量器 校正区间是什么? | |
How do you determine when to do a Gauge R&R? | |
How long do you keep the above records? 以上的记录你们保持多长时间 | |
What MAJOR types of inspection and testing equipment do you have? | |
主要的检测类型 和检测设备是? | |
TEST AND INSPECTION DATA | |
∙ Product/process performance data retained and reviewed | 5 |
∙ Customer required performance data retained | 4 |
∙ Only First Piece/last Piece data collected | 1 |
本文发布于:2023-06-30 19:38:21,感谢您对本站的认可!
本文链接:https://www.wtabcd.cn/fanwen/fan/78/1070773.html
版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。
留言与评论(共有 0 条评论) |