品质计划(Quality plan)-英文版

更新时间:2023-06-28 00:19:12 阅读: 评论:0

affirmativePrepared By :
Reviewed By :
Distribution :
(Location)
Department :
Engineering / Production / LQC / QE / QA
Model:xxxx
ftl
(Customer model:xxxx)
1.0Purpo
dele
This document provides the quality acceptability guideline for the inspection and testing of xxxx.
communicate
2.0Responsibility
This is the plant manager’s or operation manager’s responsibility to manufacture the product in comply with the quality specification, and quality manager’s responsibility to ensure product for shipment con achieve the quality requirement as stated in this procedure.
3.0Applicable Document :
(1)MIL-STD-105E Sampling Inspection by Attributes
(2)Product Specification for corresponding manicure t.
学西点要多少钱(3)Engineering Drawing.
(4)Production flow chart and working instructions in process.
4.0Definition
Critical Defect :
A condition which testing, experience of judgment indicates indicate is likely to result in a hazardous,
unsafe, or rious objection by the customer, or makes the product subject to governmental izure or recall.
Example : Hi-Pot test failure
Major Defect :
摒弃前嫌
A condition which testing, experience of judgment indicate is detrimental to the sale-ability of the finished product or any condition which renders the item unable to perform its intended function. Example : Inferior performance of the product祛痘小窍门
crazy是什么意思
1
Minor defect :
A condition which testing, experience of judgment indicates is would not effect product function nor greatly alter unit appearance, but which is objectionable when found in large quantities. Example : Scratches in appearance
5.0Failure Handling
Defective units found during inspection or testing must be removed from the production flow for repair. Only repaired and re-inspected defective units can be put back into the production flow. When non-conformance is found in production line which increas up to an unacceptable level, production engineering has to investigate the cau and take corrective action. In ca of no improvement or further deterioration, production will be stopped until condition has been corrected.
6.0Incoming inspection
Strictly control the incoming quality to assure production plan according to << incoming inspection program (ISO document no.:QP-QA-06)>> and quality sampling plan MIL-STD-105E.
2
7.0In-process 100% Checking
7.1According production flow chart and WIP with indication.
8.0 FQA Sampling Inspection
Sampling Size : Level II
Critical : 0 Major : 1.0 Minor : 2.5
Conclusion Standard: Golden Sample& Product specification.
8.3 Function Check
生产用英语怎么说According with test items of product specification.
3
9.0 Product quality plan list
4
5
P r o d u c t  Q u a l i t y  P l a n  L i s tlf confident

本文发布于:2023-06-28 00:19:12,感谢您对本站的认可!

本文链接:https://www.wtabcd.cn/fanwen/fan/78/1054969.html

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。

标签:
相关文章
留言与评论(共有 0 条评论)
   
验证码:
推荐文章
排行榜
Copyright ©2019-2022 Comsenz Inc.Powered by © 专利检索| 网站地图