Perform Capacity Verification (产能确认)
Shaded Cells are calculated but can be overwritten
Weekly Capacity Demand : CPV/week = (A) from PP-S-F041
(每周产能要求)1000Hourly Capacity Demand : CPV/hour/line = (C) from PP-S-F041
(每小时产能要求)8.0
Enter # Lines =3
Hour (小时)
Scrap /Off-Line Rework (报废/重
新加工)
Total Good Parts (所有好的产品零件)
Up Time All Lines (Minutes)(生产时间/分钟)Required (需求数)
Actual (实际生产
flashback数)Actual (实际报废
青岛雅思培训数)
Actual (实际数量)Actual (实际时间)
Plan (计划时间) Actual (实际时间) Plan (计划时间)
178085733029919600003990960000478085000105880857030688085802078808580208780854560
9101112131415
The default length of the capacity verification event is one day of the customer's daily production requirements, including changeovers and
requirements must have concurrence from the Program STA Manager (minimum one full shift of 8 hrs). Required number of parts per hour is bad on C
苹果广告主题曲Line Speed Demonstration
英文论文润色
(Enter Data from Actual Production Run) 输入数据)
Total Parts Produced (total for all lines)(所有生产的零件)
Downtime (Minutes)(停机时间/分钟)Breaks (
(休息时间Prior Capacity Verification Date (预估能力确认日期)
Determine Customer Requirements (顾客要求)
Planned Cy
(计划生产一个零件的时Planned Scra
(Ford Part Number (福特零件号)
FSM345/393Program Name & Model Year (计划名称/样年)Supplier Mfg. Code (供应商制造编号)Ford Part Name (福特零件名称)Drive Housing Date (日期)
Supplier Name (供应商名称)Changsha Auto Electric
relong
Capacity Ver (许多英语
Process / Ope
Supplier / Part Information (供应商/零件信息)
territorialExample filled out as if 3 lines running. 线运转为例)
Form PP-S-F042
(PSW-003 Attachment A)
Determine Daily Production Volume (实际每天产量)
Determine the daily production volume from the actual data above. (从上面的实际数据中查证每天的产量。)
Multiply the total number of good parts produced in an average 8 hour shift by the number of shifts per day or, if above run did not accurately reflect a shift, multiply the average number of good parts produced per hour by total number of hours per
Determine Weekly Production Volume (实际每周产量)
Determine the weekly actual production volume from the actual data above. (从上面的实际数据中查证每周的实际产量。)Multiply the total number of good parts produced in an average 8 hour shift by the number of shifts per week or, if above run did not accurately reflect a shift, multiply the average number of good parts produced per hour by total number of hours per
principal是什么意思(结果
P
as long asOverall Equipment Effectiveness (总的设备使用效率) OEE = (F * I * K)
culated but can be overwritten
Follow steps 1-6
G
查证每周的实际产量。)
per week or, if above run tal number of hours per
(公式)
量)
Number of good parts per day (每天优良零
产量。)
四级英语作文
per day or, if above run tal number of hours per
量)
Number of good parts per week (每周优良零
(高于或低于每日计划量的百分比/最少8
=
4.76%