C4_HVAC SPECIFICATION_2009_R0

更新时间:2023-06-27 01:55:29 阅读: 评论:0

B a s i c H V A
C R e q u i r e m e n t
暖通空调系统要求
Basic Design Requirements
基本设计要求
1 General概述
1.1 The HVAC Specification is applied for all the stores of China, which guide the design, procurement,
construction & final acceptance works of the stores conversion,upgraded, retrofits or renovated and expansion. The sales area, shopping mall, office, storage, facilities plant, receiving yard, etc are involved.
The detailed functions are as followings:
本规范应用于中华人民共和国范围内家乐福的所有新建,改建的超级市场。家乐福超市的功能分布包括卖场区,商铺区,仓库区,办公区及设备辅助用房。
1.1.1 In sales area the goods like the appliance, fabric, grocery, bakery, fish, meat, salar bar, vegetable, fruit,
makeup, steamed & fried foods, etc are sold.
其中卖场区包括化妆品,家电,服装,杂货食品,肉课,鱼课,沙拉吧,面包房,熟食,中式点心,蔬果等销售区域。
1.1.2 In shopping mall area the various of rent shops are occupied, such as the kinds of restaurants, food court,
dress & shoes shop, laundry shop, bakery, beauty shop, tea shop, drugstore and so on.
其中商铺区包括各种餐饮,食街,服装鞋类,洗衣店,面包蛋糕店,美容,茶类,药房等小型商铺。
1.1.3 The each department of the store occupies the office and executes the daily business. The store
manager office, finical office, curity office, cashier office, maintenance office, conference room, locker room, negotiation room, smoke room & canteen, etc are usually necessary.
办公区包括店长办公室,财务办公室,保安办公室,收银办公室,维修办公室,会议室,更衣室,谈判间等。
1.1.4 The storage is normally keeping the temporary goods for revolving; the goods are arranged by the
department. Normally there is the valuable and expansive goods storage inside.
仓库区包括各类商品的临时普通仓库及精品贵重物品仓库,收货区及收货办公室等。
1.1.5 The receiving yard is connected to outside, transferred and the staff take over the goods at this area.
收货区是和室外相通,收货人员在此接收货物。
1.1.6 The facility plant include the substation, power distribution plant, chillers & pumps plant, refrigerant
equipments plant, AHU plant and so on, which are vered for the whole store.
辅助设备房包括变配电间,区域配电间,冷冻机和泵房,制冷设备间,空调箱房等,其中的设备都服务于整个店。
1.2 Design Institute or Contractor shall complete the whole construction works with accordance to the latest
version of specifications, standards, regulations and code of practice which issued by national and regional government, and requirements by CARREFOUR which listed in the design contract and or tender and must co-ordinate with local codes and regulations.
设计院或承包商都必须按照最新的国家和当地规范、标准和技术要求,以及CARREFOUR对每一项目的具体设计委托书或招标书要求完成整个建筑工程,并与当地的条例和法规相协调。
1.3 The HVAC system ud for CARREFOUR area shall be operated and controlled independently out of the
whole building, which shall not to u with other tenements together. Meanwhile the energy counting shall be according to the water & electricity meter. Before the meters are gotten into u, the Precision Certification of the calibration & verification shall be submitted to the CARREFOUR for approval. If CARREFOUR has to u cooling & heating source system with other landlord’s tenements, and invest a lot for isolating the system, the thermal meter could be considered to u. The unit price by the thermal meter should be regulated in the lea contract.
家乐福制冷和采暖空调系统必须独立于整个建筑,独立控制,同时其能源消耗的计量必须使用水表和电表准确的计量。电表水表的投入使用之前,必须递交家乐福相关国家相关部门对此表具的精度审核计量校准报告。如
果不得不与其它租户共用一套冷热源系统,而且冷热源系统独立改造需要花费大量投资,可以考虑使用热表计量方式计费。
1.4 Every system listed in this booklet is the general descriptions of completed system of CARREFOUR, there
may be discrepancies among areas in China
some say love it is a river
本标准中的各系统是对CARREFOUR完整系统的一般性描述,全国各地情况不同,具体可能会有所差别。
1.5 Design Principle and Standard
设计依据
alevel选课指南Proposal
Architectural
1.5.1 Approved
批准的建筑设计方案
1.5.2 CARREFOUR’ design data and requirements.
由CARREFOUR提供的设计资料及要求
1.5.3 Design data by relevant professional institutions
相关专业提供的设计资料
1.5.4 Relevant national specifications for HVAC, applicable items including but not limited to are listed as
followings:
暖通专业有关的国家规范,适用的规范条目包括但不限于如下:
1.5.4.1 Specifications for Acceptance and Inspections for Construction Quality for HVAC
《通风与空调工程施工质量验收规范》(GB50243-2002)
1.5.4.2 Specification for Acceptance of Installation for Refrigeration and Air Separation Equipment
《制冷设备、空气分离设备安装工程施工及验收规范》(GB50274-98)
1.5.4.3 Specification for Acceptance of Installation for Air Compressor, Fan and Water Pumps
《压缩机、风机、泵安装工程施工及验收规范》(GB50275-98)
1.5.4.4 Standard Noi Level for Urban Environments
《城市环境噪声标准》(GB3096-82)
1.5.4.5 Design Specification for Fire Protection for Architectural Premis
《建筑设计防火规范》(GB50016-2006)
1.5.4.6 Design Specification for Fire Protection for High Ri Building
《高层民用建筑设计防火规范》(GB 50045—95)(2005版)
1.5.4.7 Design Specification for construction for Thermal Insulation for Industrial Equipment and Piping
《工业设备及管道绝热工程设计规范》(GB50264-97)
1.5.4.8 Specification for Acceptance of construction for Thermal Insulation for Industrial Equipment and
Piping
《工业设备及管道绝热工程施工及验收规范》(GBJ 126-89)
Design Drawing Specification
Of
1.5.5 Requirement
设计图纸要求撒谎英文
The content of HVAC design document should include as listed following:
所有的暖通文件和图纸必须包括以下各项:
─ Drawing List
skyscraper图纸目录
─Descriptions of Design and Construction
设计及施工说明
─Layout plan, System plan, Sectional Drawings and Detail Drawings
sign up平面图、系统图、剖面图、详图
─Main Equipment and Material Lists
情人节英文主要设备及材料表
─ Calculation Sheet
计算书
All the drawings included should be conducted in accordance with international units and should be complete, accurate and easy to read and end up with no mistakes after check-correction. Design drawings should also be examined by CARREFOUR and relevant authorities for their approval.
其中图纸必须以国标为基础绘制,做到完整、准确、清晰,且经过校审无误(规范无误、技术要求合
理无误、实际使用无误),并顺利通过CARREFOUR与政府要求的图纸审核。
If some area are not clearly shown in the drawings, detailed drawings and part plan must be provided. Otherwi, related details of installation and construction should be shown on the layout plans and system drawings. The schematic drawing shall be drawn by the diagram type. All the main performance data of equipment shall be indicated. The equipment block shall be u the CAD block supplied by the equipment supplier. The schematic drawing shall be designed by Carrefour template.
应当指出的是,若图纸在局部区域无法明显示出,则须绘出局部详图。另外,要求在各平面图、系统图示出各相关细节施工安装详图。其中系统图必须按照流程图绘制。设备的主要技术参数必须标注在其上。空调系统图纸必须根据家乐福的样板图纸设计。
The relative elevation of all kinds of duct shall be verified carefully, which avoid the unreasonable space management between air-supply, air-return, fresh-air, de-smoke, makeup-air, etc.
必须校验所有风管的相对标高,走向及位置,避免送风,回风,新风,排烟,补风等各风管交叉时的不合理布置,造成现场施工标高的失控。
1.6 Air-condition Region Of China
区域分布济南翻译公司
Depending on the administration management, Carrefour China is divided into 4 regions as following.
根据家乐福的行政管理,家乐福中国划分成4个区域如下:
Region区域Typical City代表性城市
East Region 华东区Shanghai上海, Nanjing南京, Wuxi无锡, Suzhou苏州, Hangzhou杭州, Nantong南通, Hefei合肥, Zhengzhou郑州, Luoyang洛阳, Xuzhou徐州, Ma’anshan马鞍山, Bengbu蚌埠
North Region
北方区Beijing北京, Harbin哈尔滨, Tianjin天津, Qingdao青岛, Jinan济南, Shenyang沈阳, Dalian大连,Mudanjiang 牡丹江
South Region
南方区Guangzhou广州, Zhuhai珠海¸ Foshan佛山, Kunming昆明, Xiamen厦门, Fuzhou福州, Putian 莆田, Haikou海口, Shenzhen深圳, Dongguan东莞,
Central Region
中西部区
Chengdu成都, Chongqin重庆, Wuhan武汉, Urumqi乌鲁木齐, Xi’an西安
China has the huge territory. The different geographic location and meteorological climate there are in the various cities. Generally in the construction field, the Frost Zone, Hibernal Zone, Hot Summer & Chill Winter Zone, Hot Summer & Warm Winter Zone and Warm Zone are parated in accordance with the climate condition of China. It has the great impact to the HVAC design.
中国有着巨大的版图。各地的地理位置气象条件各异。一般来说,中国的建筑业将中国按气候条件分成严寒地区,寒冷地区,夏热冬冷地区,夏热冬暖地区和温暖地区。各地的不同气象条件对于空调的设计起着巨大的影响。
pt是什么意思So when the designer decide the enclosing structure and calculate the HVAC load, the local climate parameter should be complied with the following standard or regulations.
特此在进行负荷气象计算,围护结构设计时,必须符合以下各标准执行:
– 《Specification for Design Criteria for HVAC》(GB50019—2003)
《采暖通风与空气调节设计规范》(GB50019—2003)
清洁工英文– 《Criterion of the portion of the climate province》(GB50178-93)
《建筑气候区划标准》(GB50178-93)
– 《Energy Saving Criterion for the Public Building》(GB 50189—2005)
《公共建筑节能设计标准》(GB 50189—2005)
1.7 Basic Principle of HVAC System
家乐福空调系统的一般原则
友谊英文The Carrefour HVAC System shall be according to the following basic principles:
家乐福超市的暖通系统必须按以下基本原则综合考虑:
1.7.1 The investment cost of procurement and installation shall be considered.
采购设备以及安装的费用及投资
1.7.2 The layout requirement of equipments and duct & pipe line’s space.

本文发布于:2023-06-27 01:55:29,感谢您对本站的认可!

本文链接:https://www.wtabcd.cn/fanwen/fan/78/1047960.html

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。

标签:设备   规范   系统   设计
相关文章
留言与评论(共有 0 条评论)
   
验证码:
推荐文章
排行榜
Copyright ©2019-2022 Comsenz Inc.Powered by © 专利检索| 网站地图